A study guide to WGU's C722, the undergraduate course on managing a project from selection and planning to scheduling, execution and close.

Updated October 2026 · 5 min read

C722 Project Management at Western Governors University prepares undergraduates to manage a project from start to finish in any kind of organization, using a range of project management methods and tools.

WGU's B.S. Accounting program guide lists the course at three competency units in term nine, and it appears in other WGU business degrees. The guide names project profiling and phases, constraints, building the team, scheduling and risk, with practice in each project phase.

Students usually find the planning documents straightforward and the scheduling network harder. Drawing the network correctly and finding the critical path is where many lose time.

Course at a Glance

ItemDetails
UniversityWestern Governors University (WGU)
Course codeC722
LevelUndergraduate, competency-based
Competency units3 (B.S. Accounting guide)
Subject areaProject management
Typical workProject plan documents, network diagrams, applied questions

What C722 Covers

The program guide lists seven competencies:

Key Concepts Explained

The Triple Constraint

Scope, time and cost are linked: change one and at least one other moves. Quality sits in the middle. Adding features without more time or budget usually puts quality at risk.

Project Selection

Organizations choose projects with financial measures (payback, net present value) and non-financial ones (strategic fit, risk, regulatory need). Weighted scoring models combine several criteria into one comparable score.

Critical Path

The critical path is the longest path through the network. It sets the shortest possible project duration; any delay on it delays the whole project. Activities off the critical path have slack.

Example: Activity A takes 3 days. B (5 days) and C (2 days) both follow A. D (4 days) follows both B and C. Path A-B-D takes 12 days and path A-C-D takes 9 days, so A-B-D is critical and the project needs 12 days. C has 3 days of slack: it can slip by up to 3 days without delaying completion.

Typical Assignments and How to Approach Them

WGU assesses competency through performance assessments or objective assessments; check your course page for the current format. Work in this subject typically includes:

Task typeWhat it testsHow to approach it
Scope statement or charterDefining the projectState goals, deliverables and exclusions
Work breakdown structureDecomposing workBreak deliverables into manageable tasks
Network diagramScheduling logicList dependencies before drawing
Risk registerAnticipating problemsRate likelihood and impact, add responses

Predictive Versus Agile Approaches

One competency asks how different project management methods are used. The most common comparison is between predictive (waterfall) and agile approaches:

FeaturePredictiveAgile
PlanningDetailed plan up frontPlanned in short cycles
ScopeFixed earlyExpected to evolve
Best forStable, well-defined workUncertain or changing needs
ExampleBuilding a warehouseDeveloping a new app

In a scenario, justify the method from the project's characteristics: how clear the requirements are, how often they will change and how much the customer needs to see early results. Hybrid approaches are common and acceptable if you explain them.

Where Students Get Stuck

Study Tips for C722

How We Help with C722

Send the task instructions, rubric, scenario and any evaluator feedback. A project management tutor prepares custom plan documents and schedules, explains the critical path method step by step, or reviews your draft and diagram for logic errors.

GradeEssays is independent of Western Governors University. Our work is tutoring and reference material: use it to learn the methods, then complete and submit your own work under WGU's academic integrity rules. We never log in to student portals. Every order is written from scratch, with free revisions within the scope of your original request.

Plan Your C722 Work with Confidence

Share the instructions and any evaluator feedback. A writer prepares a custom worked plan or reviews your draft.

Start My C722 Help

Free revisions · Full refund if late · Written from scratch for your order

Frequently Asked Questions

How many competency units is C722?

WGU's B.S. Accounting program guide lists Project Management at three competency units.

Is C722 the same as C783?

No. C783 is the graduate project management course in the M.S. Data Analytics (Decision Process Engineering) program, built around the PMBOK Guide. C722 is the undergraduate business course.

How do I find the critical path?

List each activity, its duration and predecessors, then add up each path through the network. The longest path is critical.

What is slack?

Slack, or float, is how long an activity can be delayed without delaying the whole project. Critical path activities have zero slack.

Does C722 cover agile?

The course covers different project management methods. Comparing predictive and agile approaches is a sensible way to prepare for that competency.